En
En Pl
EUR
Main menu

Prologic Heavy Duty Long Leadclip w/Pins & Tailrubber Price from 6.11 € View products

A safe lead clip system for use with extremely heavy leads ideal for big river fishing Designed to release the lead should it become snagged For use with size 8 swivel The metal arm reduces twist, releases easier and is stronger for bigger leads
Share:
Special prices
Korda Stowaway Case
Special price!
2.22 €     7.11 €
Gamakatsu Hooks Gamakatsu G-Carp Specialist
Special price!
3.33 €     5.33 €
FOX Monofilament Lines Trans Khaki Tapered Mono Leaders
Special price!
8.00 €     13.33 €
17.78 €     17.78 €

Heavy Duty Long Leadclip w/Pins & Tailrubber

A safe lead clip system for use with extremely heavy leads ideal for big river fishing

  • Designed to release the lead should it become snagged

  • For use with size 8 swivel

  • The metal arm reduces twist, releases easier and is stronger for bigger leads

Prologic
Prologic
Our consultancy team welcomed the addition of one of the best carp anglers in the game in the form of UK team member, Adam Penning. Adam needs little introduction, having worked in the fishing industry in excess of 30-years and we’ve wasted no time in using Adam’s 30+ years of angling experience to help us develop fresh product ideas to bolster Prologic already strong portfolio, many of which will come to fruition towards the end of 2017. As a full time carp angling tutor, Adam spends 5-days a week on the bank and has certainly played a key role in testing our gear to the absolute limit and, thanks to his great understanding of products, we’re able to adapt projects accordingly.
One thing that hasn’t changed is our passion for carp fishing. All of our products are designed by passionate carp anglers, for passionate carp anglers as it always has been.
E-catalogue

Recent comments

You have to log in to add an opinion